Back to feed

Nepal rescuers pull two workers alive from Trishuli 3A tunnel nine days after floods

1 min
Nepal rescuers pull two workers alive from Trishuli 3A tunnel nine days after floods

This digest was compiled by AI from multiple sources — links to the originals are below.

Two workers were rescued alive from the Trishuli 3A hydropower tunnel in Nepal nine days after devastating floods. They were found about 170 meters from the tunnel entrance and taken to a military hospital in Kathmandu. Rescuers also located the body of another person near them.

Key Facts

  • The two rescued workers were found about 170 meters from the entrance of the Trishuli 3A hydropower tunnel.
  • The rescued workers were taken to a military hospital in Kathmandu.
  • The death toll from the floods has reached 1,344, with about 5,000 people still missing.
  • Around 900 workers at the hydropower site are missing, and officials estimate about 500 remain trapped in underground tunnels.
  • The disaster caused an estimated $2.56 billion in damage.

Rescue Operation

Nepalese army personnel located the two workers approximately 170 meters from the tunnel entrance. The workers were transported to a military hospital in Kathmandu for medical care. Rescuers also discovered the body of another person near the two survivors.

Flood Impact

A landslide on August 26 in the mountainous border region between Nepal and China triggered a powerful flow of mud, rocks, and water down the Trishuli River valley. The disaster destroyed homes, roads, bridges, and energy infrastructure. The death toll stands at 1,344, with about 5,000 people considered missing. Damage is estimated at $2.56 billion.

Workers Trapped

Around 900 workers at the Trishuli 3A hydropower site are missing. Officials estimate that about 500 of them remain trapped in underground tunnels.

1 source

Time · lag behind first